亚洲综合天堂国产精品久久久,区产品乱码芒果精品P站,国产精品久久久久精品流畅,夏天短袖见到女同学乳突图片,天堂在线中文

International Project Contracting

Current location:Home > Core Business > International Project Contracting

Kyrgyzstan Copper-gold Concentrator Project of KAZ Minerals Group in 2008

Bazemchak Gold Concentrator is located in Alabulak, Jalalabad Province, the Republic of Kyrgyzstan. The design processing capacity is 100×104?t/a ore. NFC, as the EPC contractor of the Project, signed contracts with KAZ Minerals Group (Kyrgyzstan) Gold Branch in 2008 and 2012 respectively, including all the design of Bazemchak Gold Concentrator, equipment and materials supply, civil construction, field equipment installation, etc.

Produced By CMS 網(wǎng)站群內(nèi)容管理系統(tǒng) publishdate:2024-03-12 16:32:33